Nepal Electricity Authority Logo Generation Directorate
Nepal Electricity Authority Logo
असार २५, २०८३, बिहीबार Thursday, 9th July 2026 Generation Directorate
Contact
Maintenance Shutdown Schedule

Maintenance Schedule

Close

Notice

View More
  • Letter of Intent (Chameliya Hydropower Station)

    2026-07-07 Notice
  • Letter of Intent (PuwaKhola Hydropower Station)

    2026-07-07 Notice
  • Letter of Intent

    2026-07-06 Notice
  • Vidyut 2082

    2026-04-03 Annual Reports
  • NEA DCSD Magazine 2082

    2026-04-03 Annual Reports
  • Transmission Directorate 2082

    2026-04-03 Annual Reports
Accessibility Options